4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube

Product Details
Customization: Available
Type: Seamless/Welded
Technique: Cold Drawn
Manufacturer/Factory, Trading Company
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
2000000 RMB
Plant Area
101~500 square meters
  • 4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube
  • 4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube
  • 4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube
  • 4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube
  • 4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube
  • 4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Packaging & Shipping
  • Customer inspection
  • Inspection and certification
  • Customer visits
  • FAQ
Overview

Basic Info.

Model NO.
A210
Material
Stainless Steel
Surface Treatment
as Per Client′s Requirement
Usage
Pipeline Transport, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration, Special Purpose
Section Shape
Round
End Type
PE/Be
Size
6mm-508mm
Wall Thickness
0.5mm-40mm
Products Standard
ASTM A312/A213/A376 Ect
Grade
TP304/304L/H/N,Tp309s/310S,Tp316/316L,Tp904L Ect
Transport Package
Seaworrthy Wooden Case/Pallet
Specification
ISO/PED/ASME/DNV
Trademark
Derbo
Origin
China
HS Code
7304419000
Production Capacity
100000tons/Year

Product Description

Product Parameters
 Product Name Alloy Steel Pipe
Size OD 6mm-508mm
Thickness 0.5mm-40mm
Length 5-20M
Standard ASTM (ASME) (SA)A312 /213/376 ect
Materail and Grade TP304/304L/H/LN,TP316/316L,TP317/317L,TP321/TP321H,TP347/347H,TP309S/310S,etc
Process Method Cold drawn/cold rolled
Standard ANSI B36.19/36.10
Usage Oil Pipe, Casing Tube, Line Pipe and Fluid (Water, Gas) Transmission
Surface Bared Black Painting, Anti-Corrosion Coating
Proctor Plastic cap
Package Bundles, Bulk,wooden case
Inspection With Hydraulic Testing, Ultrasonic testing or X-ray Test
Certificate ISO 9001-2000,PED 97/23/EC,ASME,DNV
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Payment: L/C or T/T
Port of Shipment Xingang,China
 
 
Detailed Photos

4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube

Packaging & Shipping

4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube

Customer inspection

4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube

Inspection and certification

4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube

Customer visits

4 Inch 6inch Hot-Finished A210 Smls Superheater Steel Tube

FAQ

Q:What is the material of your products?

A:Our company is specialized in carbon products and metal products,we also can choose material as customer's requirement.
 
Q:What about your standard delivery date?
A:Normally the delivery time is 7-25 days .For some special case,we can make it within two weeks
 
Q:Is there any discount?
A:Sure,different quantity will have different discount.
 
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.

Chengdu Derbo Steel Co., Ltd focus on pipe&tube solution for project application for more than 10 years with good quality and reasonable price,has succeed to cooperated with Shell,Lukoil and other famous oil&gas companies all over the world.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier