A210 A1 Carbon Steel Tube for Boiler and Superheater

Product Details
Customization: Available
Type: Seamless
Technique: ERW
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
2000000 RMB
Plant Area
101~500 square meters
  • A210 A1 Carbon Steel Tube for Boiler and Superheater
  • A210 A1 Carbon Steel Tube for Boiler and Superheater
  • A210 A1 Carbon Steel Tube for Boiler and Superheater
  • A210 A1 Carbon Steel Tube for Boiler and Superheater
  • A210 A1 Carbon Steel Tube for Boiler and Superheater
  • A210 A1 Carbon Steel Tube for Boiler and Superheater
Find Similar Products
  • Overview
  • Product Parameters
  • Production equipment
  • Inspection and certification
  • Customer visits
  • After Sales Service
  • Inspection equipment
  • FAQ
Overview

Basic Info.

Model NO.
A210 A1
Material
Carbon Steel
Surface Treatment
Black
Usage
Boiler Pipe, Oil/Gas Drilling, Chemical Industry
Section Shape
Round
Od
1/2"-24"
Delivery Condition
Hot-Finished
Steel Grades
Grade a, Grade B, Grade C
Steel Standard
B36.10
Transport Package
External Black Painting, Both Side with End Caps
Specification
3mm-45mm
Trademark
Derbo
Origin
Chengdu Sichuan Province
HS Code
73063090
Production Capacity
10000 Ton/Tons Per Month

Product Description

Product Parameters
 
 Product Name Carbon steel pipe
Size OD 141mm-812.8mm
Thickness 4mm-22mm
Length 3-20M
Steel Material GR.B X42 X46 X52 X56 X60 X65 X70 X80,etc
Standard API 5L PLS 1 & PLS 2
Usage Oil Pipe, Casing Tube, Line Pipe and Fluid (Water, Gas) Transmission
Surface Bared Black Painting, Anti-Corrosion Coating
Proctor Plastic cap
Package Bundles, Bulk
Inspection With Hydraulic Testing, Ultrasonic testing or X-ray Test
Certificate API and ISO9001;2000
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Payment: L/C or T/T
Port of Shipment Xingang,China
Production equipment
 

A210 A1 Carbon Steel Tube for Boiler and Superheater

Inspection and certification

A210 A1 Carbon Steel Tube for Boiler and Superheater

Customer visits

A210 A1 Carbon Steel Tube for Boiler and Superheater

After Sales Service

A210 A1 Carbon Steel Tube for Boiler and Superheater
Inspection equipment

A210 A1 Carbon Steel Tube for Boiler and Superheater

FAQ

Q:What is the material of your products?
A:Our company is specialized in carbon products and metal products,we also can choose material as customer's requirement.
 
Q:What about your standard delivery date?
A:Normally the delivery time is 7-25 days .For some special case,we can make it within two weeks
 
Q:Is there any discount?
A:Sure,different quantity will have different discount.
 
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.

Chengdu Derbo Steel Co., Ltd focus on pipe&tube solution for project application for more than 10 years with good quality and reasonable price,has succeed to cooperated with Shell,Lukoil and other famous oil&gas companies all over the world.


Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier