4′′ Sch80 P91 High Temperature Alloy Steel Pipe

Product Details
Customization: Available
Type: Round
Standard: ASTM
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
2000000 RMB
Plant Area
101~500 square meters
  • 4′′ Sch80 P91 High Temperature Alloy Steel Pipe
  • 4′′ Sch80 P91 High Temperature Alloy Steel Pipe
  • 4′′ Sch80 P91 High Temperature Alloy Steel Pipe
  • 4′′ Sch80 P91 High Temperature Alloy Steel Pipe
  • 4′′ Sch80 P91 High Temperature Alloy Steel Pipe
  • 4′′ Sch80 P91 High Temperature Alloy Steel Pipe
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Packaging & Shipping
  • Customer inspection
  • Inspection and certification
  • Customer visits
  • FAQ
Overview

Basic Info.

Model NO.
P91
Composition
Ferrous Steel Scrap
Technique
Cold Drawn
Shape
Round
Surface Treatment
Polished
Special Use
Free Cutting Steel
Application
Boiler Plate
Od
10-400mm
Wt
1mm-80mm
Pipe End
Plain End/Beveled End/Threaded End
Product Name
Alloy Steel Pipe
Key Words
A213 T9 Steel Pipe
Quality
High Level
Sample
Available
Brand
Derbo
Payment
30% Deposit
Transport Package
in Bundle
Specification
Standard
Trademark
DERBO
Origin
China

Product Description

Product Parameters
Product Name 4'' SCH80 P91 High Temperature Alloy Steel Pipe
Standard ASTM A213
Grade ( Material) T2, T5, T5b, T5c, T9, T11, T12, T17, T21, T22, T23, T24, T36, T91, T92, T122, T911
Outside Diameter Ranges 10mm-90mm (DN6-DN80)
Wall Thickness Ranges 1mm to 10mm
Length (negotiable) For 20Ft Container 4.8m-5.8m
For 40Ft Container 4.8m-12m
Most common choice Random length(5-7m or 10-12m)
Pipe Type Cold Drawn , Seamless
Pipe End 6-60mm Plain End; 60-127mm Plain End or Beveled End
Our advantages ·Diverse products(Steel pipes, pipe fittings, other fittings)
·Any third party inspection is accepted by we company.
·Quick response in quotation, delivery, after-service.
·Focus on pipe & tube solution for project application.
Minimum Order Quantity 6 meters
 
Detailed Photos

4′′ Sch80 P91 High Temperature Alloy Steel Pipe

Packaging & Shipping

4′′ Sch80 P91 High Temperature Alloy Steel Pipe

Customer inspection

4′′ Sch80 P91 High Temperature Alloy Steel Pipe

Inspection and certification

4′′ Sch80 P91 High Temperature Alloy Steel Pipe

Customer visits

4′′ Sch80 P91 High Temperature Alloy Steel Pipe

FAQ

Q:What is the material of your products?

A:Our company is specialized in carbon products and metal products,we also can choose material as customer's requirement.
 
Q:What about your standard delivery date?
A:Normally the delivery time is 7-25 days .For some special case,we can make it within two weeks
 
Q:Is there any discount?
A:Sure,different quantity will have different discount.
 
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.

Chengdu Derbo Steel Co., Ltd focus on pipe&tube solution for project application for more than 10 years with good quality and reasonable price,has succeed to cooperated with Shell,Lukoil and other famous oil&gas companies all over the world.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier