Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe

Product Details
Customization: Available
Type: Welded
Technique: Hot Rolled
Manufacturer/Factory, Trading Company
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
2000000 RMB
Plant Area
101~500 square meters
  • Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe
  • Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe
  • Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe
  • Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe
  • Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe
  • Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Production process
  • Application site
  • Inspection and certification
  • Customer visits
  • FAQ
Overview

Basic Info.

Model NO.
STPG370-E Hot rolled Carbon Steel Pipe
Material
Carbon Steel
Surface Treatment
Black
Usage
Pipeline Transport, Oil/Gas Drilling, Chemical Industry
Section Shape
Round
Grade
10#-45#, Gr.B, Q195-Q345, St35-St52, 20#, Stpg370
Thickness
1.24 - 59.54 mm
Outer Diameter
10.3 - 1219 mm
Technical
Lasw, Hot Rolled, ERW, SSAW, etc
Packaging Details
in Bundles or Per Customer′s Requirements
Delivery Time
15~60 Days Acc. to Order Quantity
Transport Package
in Hexagonal Bundle with Steel Strip / Per Require
Specification
OD: 10.3 - 1219 mm, THk: 1.24 - 59.54 mm
Trademark
DERBO
Origin
Hebei, China (Mainland)
HS Code
7304199000
Production Capacity
3000000 Tons/Year

Product Description

 

Product Parameters

 

Name

Carbon Steel Pipe
Size

Diameter: 1/2''-28''/ 21.3-711mm  

Thickness: 3.0--45mm

Length: As your requirement.

Standard API 5L; GB/T8163,ASTM A106, ASTM A53,DIN1629,BS3095,JIS G 3454 
Material Grade Gr.B,20#,ST37,ST37-2,ST37-3,320,STPG370 etc.
Other Manufacturing Process ERW,LSAW/SSAW
Main Application Pipeline transportation systems of petroleum and natural gas industries.
Min quantity 5 tons, more quantity price will be lower.
packing External Black painting, both sides with end caps, in bundles by steel strips, covered by waterproof. Or as your requirement.
Delivery time 20-25days after receiving your deposit or L/C.
Payment TT or 100% Irrevocable LC at sight. We can discuss.
 
Detailed Photos

Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe

Production process

Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe

Application site

Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe

Inspection and certification

Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe

Customer visits

Large Size Stpg370-E Hot Rolled ERW Carbon Steel Pipe

FAQ

Q:What is the material of your products?
A:Our company is specialized in carbon products and metal products,we also can choose material as customer's requirement.
 
Q:What about your standard delivery date?
A:Normally the delivery time is 7-25 days .For some special case,we can make it within two weeks
 
Q:Is there any discount?
A:Sure,different quantity will have different discount.
 
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.

Chengdu Derbo Steel Co., Ltd focus on pipe&tube solution for project application for more than 10 years with good quality and reasonable price,has succeed to cooperated with Shell,Lukoil and other famous oil&gas companies all over the world.

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier