ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler

Product Details
Customization: Available
Type: Seamless
Technique: Cold Drawn
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
2000000 RMB
Plant Area
101~500 square meters
  • ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler
  • ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler
  • ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler
  • ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler
  • ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler
  • ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Packaging & Shipping
  • Customer inspection
  • Inspection and certification
  • Customer visits
  • FAQ
Overview

Basic Info.

Model NO.
ASTM A213 T11
Material
Alloy Steel
Surface Treatment
Black Painting
Usage
Boiler Pipe
Section Shape
Round
Od
10-400mm
Wt
1mm-80mm
Pipe End
Plain End/Beveled End/Threaded End
Delivery Condition
Normalized+Tempered
Transport Package
Fully Seaworthy Wooden/Pallet Export Packing
Specification
CE, ANSI, BS, DIN ect.
Trademark
DERBO
Origin
Chengdu Sichuan Province
HS Code
7306500000
Production Capacity
10000tons/Month

Product Description

 

Product Parameters
Product Name Alloy steel pipe
Standard ASTM A213,A335,A519 ect
Grade ( Material) T5, T9, T11, T12, T22, T23, T91, T92,  ASTM A335 P5,P9,P11,P12,P22,4130 SAE1020,SAE1035,SAE1045,SAE4130,SAE4140 ect
Outside Diameter Ranges 12.7mm-168mm
Wall Thickness Ranges 1.2mm-18mm
Length (negotiable) For 20Ft Container 4.8m-5.8m
For 40Ft Container 4.8m-12m
Most common choice Random length(5-7m or 10-12m)
Pipe Type Cold Drawn , cold rolled
Pipe End 6-60mm Plain End; 60-127mm Plain End or Beveled End
Our advantages ·Diverse products(Steel pipes, pipe fittings, other fittings)
·Any third party inspection is accepted by we company.
·Quick response in quotation, delivery, after-service.
·Focus on pipe & tube solution for project application.
Minimum Order Quantity 1 pcs
 
Detailed Photos

ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler

Packaging & Shipping

ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler

Customer inspection

ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler

Inspection and certification

ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler

Customer visits

ASTM A213 T11 Cold Drawn High Temperature Seamless Alloy Steel Tube for Boiler

FAQ

Q:What is the material of your products?

A:Our company is specialized in carbon products and metal products,we also can choose material as customer's requirement.
 
Q:What about your standard delivery date?
A:Normally the delivery time is 7-25 days .For some special case,we can make it within two weeks
 
Q:Is there any discount?
A:Sure,different quantity will have different discount.
 
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.

Chengdu Derbo Steel Co., Ltd focus on pipe&tube solution for project application for more than 10 years with good quality and reasonable price,has succeed to cooperated with Shell,Lukoil and other famous oil&gas companies all over the world.

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier