Customization: | Available |
---|---|
Material: | Carbon Steel |
Connection: | Welding |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
BENDS SPECIFICATION REQUIREMENTS | |
GENERAL DESCRIPTION | |
Outside Diameter | 1/2" to 100" |
Thickness | SCH20, SCH30, SCH40, STD, SCH80, SCH100. SCH120, SCH160. XXS |
Design Life | 30 Years |
Pipeline Design Code | ASME B16.9, ASME B16.49/ MSS-SP75 |
Service Fluid | Full Well Stream, Offshore Shallow Water Application, Subject to Potential Late Souring and Eventual Bacteria induced Corrosion. |
Third Party Inspection | Required (Upon agreement with COMPANY. Mechanical tests to be witnessed) |
MOTHER PIPE REQUIREMENTS | |
Material | Carbon Steel |
Grade |
API 5L - Gr.B/X42/X46/X52/X60/X70 etc.(PSL1 & PSL2) ISO 3183- L245/L290/L320/L360/L415/L485(PSL1) ISO 3183- L245N/L245R/L290Q/L360Q/L415Q/L485Q(PSL2) (Seamless) |
Specification | API 5L: ISO 3183: 2007 |
Chemical Composition | API 5L: ISO 3183: 2007, Sour Tests Cab Be Chosed. |
Charpy Impact Test | Required, per API 5L: ISO 3183: 2007, ASTM A370 |
Hardness Test | Required, per API 5L |
Hydro-test | Required, per API 5L |
Packing: | Standard Export Packaging or As Per Customer's Requirement. |
BEND REQUIREMENTS | |
Specification | API 5L: ISO 3183: 2007 |
Charpy Impact Test | Required, per API 5L: ISO 3183: 2007 MSS SP75 |
Hardness Test | Required, per API 5L: ISO 3183: 2007 MSS SP75 |
Dimensional Tolerance | +/-1 degree |
External Surface Treatment | 3-Layers Polyethylene / Fusion Bonded Epoxy (FBE) |
Number of Qualification Bends | Per section API 5L: ISO 3183 |
Marking | Per API 5L: ISO 3183 |
Q:What is the material of your products?
A:Our company is specialized in carbon products and metal products,we also can choose material as customer's requirement.
Q:What about your standard delivery date?
A:Normally the delivery time is 7-25 days .For some special case,we can make it within two weeks
Q:Is there any discount?
A:Sure,different quantity will have different discount.
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.
Chengdu Derbo Steel Co., Ltd focus on pipe&tube solution for project application for more than 10 years with good quality and reasonable price,has succeed to cooperated with Shell,Lukoil and other famous oil&gas companies all over the world.